Home Working sustainably Resources used at work

Timber strip flooring

Materials used in the installation:

  • strip flooring - as specified by the client

  • timber battens - to fix to the concrete subfloor

  • plastic sheeting and duct tape - to install the vapour barrier

  • flooring nails and concrete nails - for fixing the strip flooring and battens

  • construction adhesive - for gluing the flooring to the battens.
Industry Network Training and Assessment Resources
© 2023 Workspace Training